Biological wastewater treatment · Kerala, India

Welcome to the future of sewage treatment.

Nature-powered biological treatment. Custom-engineered solutions. Designed around your needs.

  • ApproachBiological treatment
  • ConfigurationsStandalone · MBBR · Reed bed
  • ReachAll 14 districts of Kerala
The BIO POD process, from inlet to outlet A simplified process diagram: wastewater enters an oil and grease separator with enzymes, flows through four BIO POD treatment tanks, passes through a reed bed, and leaves through the outlet. Inlet PRE-TREATMENT Oil & grease separation · enzymes 4 × BIO POD® 01 02 03 04 Reed bed Outlet
Inlet Oil & grease separator 4 × BIO POD® Reed bed Outlet
Scroll to explore

01 — The constraint

Conventional treatment asks a lot of a site.

Installation space, powered mechanical equipment and ongoing operational attention shape many sewage treatment arrangements. BIO POD® was designed to reduce how much a site has to give.

Space

Footprint has a cost

Conventional STP arrangements can occupy significant installation space, which a home, an apartment site or a commercial building may not have to spare.

Power

Treatment usually means running plant

Powered aeration and mechanical equipment add energy demand, maintenance routines and points of failure to a wastewater system.

Attention

Complexity needs operators

Equipment-heavy systems depend on routine operator intervention. BIO POD® is designed for simplified operation, with no routine maintenance required.

A compact, low-energy approach to wastewater treatment.

That is the intent behind BIO POD®: a specially designed biological tank that carries the treatment process, rather than a plant room of machinery doing it.

Why BIO POD

02 — The approach

Biology first.
Engineering around it.

BIO POD combines biological treatment with practical fabrication. The tank is designed around the site, the wastewater volume and the treatment stage the project needs.

01

Microorganisms do the work

Specialised microorganisms support the biological breakdown of organic matter inside a purpose-built tank.

02

Designed internal stages

An engineered internal arrangement guides wastewater through the treatment stages defined in the project's engineering drawing.

03

Fewer moving parts

The standalone BIO POD treatment process is designed to operate without electricity. Additional stages may have their own power requirements.

The selected configuration depends on wastewater characteristics, treatment objectives, available space and applicable requirements.

03 — Installation process

Four stages to a working system.

BIO POD is built around the project's wastewater volume, then installed in four stages: tank sizing, lining and plumbing, bacterial charging, and the final treatment stage.

01

Tank sizing

The capacity and volume of BIO POD is decided by wastewater volume.

02

Plumbing and biomatrix lining

Plumbing and biomatrix lining installation, including the gas vent, oil and grease separator, and post-filtration arrangements within the baffle walls.

03

Bacterial charging

AMI bacterial charging of the system and installation of the inspection chamber grills.

04

Final treatment stage

Installation of the MBBR system or reed bed, completing the BIO POD installation and making the system ready for operation.

Four-stage BIO POD installation Stage one sizes the tank from the wastewater volume. Stage two installs plumbing and the biomatrix lining, with the gas vent, oil and grease separator and post-filtration. Stage three charges the system with bacteria and fits the inspection chamber grills. Stage four adds the MBBR unit or reed bed and completes the installation. volume capacity decided by flow 01 02 03 MBBR / reed bed 04
Installation sequence · four stages Stage order may overlap on site

Each stage is confirmed against the project's approved drawings before work begins on site.

04 — Configurations

Three ways to configure the treatment.

The right arrangement depends on the wastewater, the site and the treatment objective. Each configuration is engineered for the project rather than chosen from a fixed catalogue.

A

Standalone BIO POD

No electricity in BIO POD stage
Treatment processBIO POD
Best suited to
Projects where the BIO POD configuration meets the treatment objective.

A biological wastewater treatment solution carried out within the BIO POD tank arrangement. The standalone BIO POD treatment process is designed to operate without electricity.

B

BIO POD + MBBR

MBBR stage needs power
BIO POD ~80%MBBR ~20%
Best suited to
Projects that require an additional biological treatment stage.

BIO POD is combined with a separate MBBR system. In the company's described configuration, approximately 80% of the treatment process takes place in BIO POD and the remaining 20% in the MBBR stage. The MBBR stage requires electricity.

C

BIO POD + reed bed

Described as electricity-free
BIO POD ~80%Reed bed ~20%
Best suited to
Projects where adequate land is available for a reed bed stage.

Where adequate land is available, a reed bed can serve as the additional treatment stage. In the described arrangement, approximately 80% of treatment takes place in BIO POD and the remaining 20% in the reed bed. Both stages are described as electricity-free.

Stage allocation, not removal efficiency. The 80:20 split describes how the treatment process is divided between stages. It is not a percentage of pollutant removal. Treatment performance depends on design, installation and operating conditions.

Compare the solutions

05 — Engineering

Built to the site, not the catalogue.

BIO POD tanks are designed and manufactured in-house around wastewater volume, available space and installation conditions, from individual homes to larger developments.

Solutions and services
Household Individual homes and villas, planned around available site space.
Community Apartments, gated communities and residential townships.
Commercial Offices, hospitality, healthcare and institutional campuses.
Large developments Township-scale and multi-building projects.
Manufacturing

In-house fabrication

Tanks are manufactured in-house to project-specific dimensions and capacity.

Delivery

Consultancy and turnkey installation

Site assessment, configuration guidance, installation coordination and AMC support where agreed.

07 — Kerala presence

All fourteen districts.

BIO POD reports a presence across all 14 districts of Kerala, bringing biological wastewater treatment closer to communities, institutions and businesses across the state.

Districts reached
14
Reported projects
250+
Reported cumulative treated
2 MLD+

Company-reported figures. Definitions and counting basis are being confirmed by the company. Presence across a district does not imply a specific number of installations.

Open the district map Select a district to open the map
Kerala · 14 districts Select a district
Loading district boundaries…

District boundaries · india-maps-data Open the district map

08 — Our clientele

Our clientele.

Kochi Metro Rail Limited (KMRL) Kerala Police Housing Construction Corporation ULCCS Ltd CMI Slip Architects SOBHA Christ College, Irinjalakuda KLM Aviva Finvest Manappuram Home LAKNO Sacred Heart's College SEED Indian Railways CPWD Ambady Constructions Birthvillage Innate Conventional Eco Land KEC Kerala Police Academy (KEPA)

Organisations identified by the company as part of its clientele. Logos, capacities and case studies are published after verification and permission.

09 — Start a conversation

Tell us about your project.

Share the wastewater flow, site constraints and treatment objectives you are working with. Our team will help identify a suitable configuration.

What happens next

  1. 01You share the wastewater flow, site constraints and treatment objective.
  2. 02We review the requirement against suitable configurations.
  3. 03Our team responds with guidance on the next step.